Thursday, November 8, 2007

throw a few coins







A friend of mine who is from a Greek back ground said to throw a few coins in the slab when its being poured its supposed to bring prosperity and good luck. Might just give it a goe if i can get there in time. When we first saw the block their was a rainbow over head. We thought now that means good luck for the future.
This is the PORTER DAVIS HEYWOOD home which we are going to build with the Fremantle Facade.Of cause the bricks and facade colours will be different.

signing of final contract drawings

Today we signed the final building drawings. I thought the site start which they said is tomorrow would be a scrape of the block but it turns out it wasnt .It meant the drawings would be sent over to construction by next wednesday and they will start scraping the site next friday Nov 16.

Tuesday, November 6, 2007

Sunday, November 4, 2007

the damage lay back


mentionedin earlier posts about the damaged lay back heres a pic

we have a tap


we have a tap . drove to the block today just to check everything out before site start this friday . PD have installed the tap and water meter... yippee good to see that something is moving. took a couple of pics in the pouring rain. the block seems to have taken the heavy down pour really well.

Tuesday, October 30, 2007

site start

our sales consultant has told us site start will be november 9th... yippee. a month earlier than expected!!!!

Thursday, October 25, 2007

building permit

received our building permit in the mail yesterday... not long to go now:)))). we are supposed to get our final drawings in the mail anyday soon. Still undecided what to do with the aircon, we want to get it installed wont be till later on because of money. If we got the add on air it would mean a extra 3grand or so when you compare it with evaparated. which is worthwhile in the end. . But after asking a couple of ppl who have evaporated they could only give positive comments about it. So i think in the end we will go for evaporitive.